We repair leaking basement wall cracks and tie-rod holes in Sterling Heights from inside the basement, injecting epoxy through the full thickness of a poured concrete wall so water has no open path left. Approximate prices are approximately $500 to $600 for a small crack, approximately $1,500 for a full-height crack ($2,000 if someone already filled or patched it), and approximately $150 per tie-rod hole. The estimate is free, and we’re based next door in Shelby Township.
Sterling Heights has two kinds of basements, and they crack differently. The ranches, colonials and tri-levels from the 1960s and 70s boom, when the old Sterling Township filled with subdivisions almost overnight, mostly sit on concrete block. The newer subdivisions toward the north end of the city mostly have poured walls. Which one you have decides what a crack means and how we fix it.
What a crack usually means in a Sterling Heights basement
On a poured wall, the usual leak is a thin vertical or slightly diagonal shrinkage crack, often under a basement window, with a dark stain spreading at the bottom after rain. These are almost always water problems, not structural ones, and epoxy injection is the right fix.
On a block wall, cracks follow the mortar joints. A stair-step crack near a corner where the blocks still line up is mostly a water path. A long horizontal crack with the wall leaning in above it is the clay and frost pushing on the wall. Hollow block can’t be injected the way poured concrete can, so on block we talk about drainage or bracing instead, and we’ll tell you which one it is.
The ground makes all of this worse here. Most of the city sits on flat lake-plain clay that holds water against the wall for days after a storm, swells when it’s wet and shrinks when it dries. The Clinton River and the county drains that run through town were part of why so many basements took water in the August 2014 flood. A crack that stayed dry for twenty years can start weeping once that clay has worked on it long enough.
Approximate crack repair prices in Sterling Heights
| Job | Approximate price |
|---|---|
| Small crack (each) | Approximately $500 to $600 |
| Full-height vertical crack, never repaired | Approximately $1,500 per crack |
| Full-height crack that was filled or patched before | Approximately $2,000 per crack |
| Tie-rod (rod) hole | Approximately $150 per hole |
| Horizontal crack, never patched before | Approximately $1,500 per 7 ft of wall |
| Carbon fiber strips for a slight bow | Approximately $1,500 to $2,500 |
| Steel I-beam brace for a bowing wall | Approximately $1,500 per brace |
These are approximate prices by the job, never by the hour, and we confirm the number at the free estimate after we see the wall. If you have more than two cracks or tie-rod holes, or need more than one brace, the whole job gets a heavy discount. We also offer a military discount and financing. Leak repairs fall under our 25-year transferable warranty, which covers waterproofing work only, so braces and carbon fiber aren’t part of it. For the bigger picture on what crack work costs around Michigan, see our foundation crack repair cost guide.
Rod hole leaks in Sterling Heights
If the wet spots on your poured wall are small and round and sit in neat rows, they aren’t cracks. They are tie-rod holes, where the steel ties that held the concrete forms together were snapped off and patched when the house was built. Those patches dry out over the years and start letting water through, usually first on the side of the house where the downspouts dump or the yard slopes toward the wall.
We seal rod holes the same way we seal cracks, with epoxy injected from inside, at approximately $150 per hole. Several holes usually fit in an hour or two. You can see a recent job of this kind in our write-up of a rod hole and crack repair in Rochester Hills, a few miles northwest of here.
How the repair goes
- We find where the water is really coming in. A stain under a crack can come from the window well or a pipe seal above it, so we check those first.
- We clean the crack, set small injection ports along it every several inches and seal the face of the crack with paste.
- Once the paste cures, we pump epoxy in at the lowest port and work up until it shows at the port above, which tells us the crack is full from face to face.
- The ports are cut off flush. Nothing outside gets dug up, and one crack is usually a couple of hours start to finish.
On a finished basement we need to open the drywall along the crack, and you or your drywall person close it up afterward. The foundation crack injection page goes into the materials in more depth.
When a crack is really a drainage or structural problem
Injection fixes a crack. It doesn’t fix a basement where water comes in along the floor joint all the way around, or up through the slab. That’s a drainage problem, which is common in the older block houses here, and the answer is interior waterproofing to a sump pump, plus downspouts and grading outside. A horizontal crack with the wall leaning in is bowing wall repair first, and since bracing is structural, expect a building permit from the city.
A dry hairline crack in a poured wall that isn’t growing can be watched. Pencil a mark at each end with the date. If it gets longer or wider, or leaves a damp stain after a hard rain, call us. Anything wider than a pencil lead, offset so one side sticks out, or horizontal deserves a look now.
Recent work in Sterling Heights
Two Sterling Heights jobs have full write-ups with video: a finished interior waterproofing system and a sump pump tied into the exterior drain tile that stopped a corner leak. For everything else we do in town, including sump pumps, flood cleanup and water lines, see our Sterling Heights page. Neighbors in Utica, Shelby Township, Clinton Township and Troy get the same crew, and we cover crack repair across the rest of the county on our Macomb County crack repair page.
To get a price, book a free estimate or call or text (586) 345-7292. We’re available 8 a.m. to 8 p.m., seven days a week.
Questions we get about crack repair in Sterling Heights
How much does it cost to fix a leaking basement crack in Sterling Heights?
Approximately $500 to $600 for a small crack and approximately $1,500 for a full-height crack, or $2,000 if it was filled or patched before. Tie-rod holes run approximately $150 each. More than two cracks or holes on one job gets a heavy discount, and the estimate is free.
What do you fill basement wall cracks with?
Epoxy, on every crack we inject. It fills the crack through the full thickness of the wall and cures hard, bonding the two sides back together, so the clay outside has no open gap to push water through.
Our 1970s Sterling Heights ranch has a crack in a block wall. Can you inject it?
Not the way we inject poured concrete. Block is hollow, so the material just fills the cores. If the crack is a stair-step along the mortar and the blocks still line up, the fix is usually drainage. If the wall is leaning in, it needs bracing first. We’ll tell you which one you have at the estimate.
Do I need a permit to fix a basement crack in Sterling Heights?
Crack and tie-rod hole injection is a repair done from inside, and it usually doesn’t need one. Bracing a bowing wall with steel I-beams or carbon fiber is structural, so expect a building permit from the city for that.
Our basement is finished. Can you still fix the crack?
Yes. We need clear access to the wall, so we open the drywall along the crack, inject it, and leave the wall ready for you or your drywall person to close up. If several cracks are hidden, we look at where the stains show first.
Does a crack in my basement wall mean the foundation is failing?
Usually not. Most vertical cracks in poured walls are shrinkage cracks and are water problems only. A horizontal crack, a crack wider than a pencil lead, or one where one side sticks out past the other is worth having us look at soon.
Watch recent crack injection jobs
Real jobs filmed by Imad “Matt” Mansour and the crew – no stock footage. Tap a video to play it with sound.
Foundation Crack Repair in Rochester Hills, MI – 38 Rod Holes Packed + Vertical Cracks Sealed
Active Foundation Crack Leak Stopped in 1 Hour – Rochester Hills, MI
Multiple Foundation Cracks Repaired in Washington Township, MI – Leaking & Preventive Injection
Vertical Foundation Crack + 6 Rod Holes Sealed – Rochester Hills, MI
See more job videos on our TikTok · Browse our project gallery